ProjectsCreate a project

Create a project

Open the + New project dialog from either:

  • the project portfolio header (#/reports/projects), or
  • the Projects section in the sidebar.

The dialog collects a few fields and then drops you onto the new project’s detail page so you can link repos and add issues immediately.

Fields

FieldRequiredNotes
NameYesUp to 200 characters. Make it specific — it’s the headline everywhere the project shows.
OrgYesThe GitHub org this project belongs to. First visible org is pre-selected.
DescriptionNoShort summary of what the project delivers. Shown under the name on the detail page.
StartNoDate the project starts. Used by the Gantt and the Timeline KPI.
DueNoDate the project is due. Drives the overdue/soon/ok pill.
LeadNoA GitHub user accountable for the project. Scoped to members of the chosen org.

A few things to know up front:

  • Status defaults to Active. There’s no status field on create; set it to Backlog or Done later from the detail page if you need to.
  • The lead is org-scoped. Switching the org clears the lead pick — a user who is a member of one org is, by definition, not a member of another. You can also leave the lead blank and assign it later from the detail page’s Lead tile.
  • Dates are whole days. Pick a date from the calendar; it’s stored as midnight UTC. Leave either field blank to leave it unset.
  • A board mirror is optional and happens later. The description mentions you can mirror dates to a GitHub Projects v2 board — that’s the link-a-board step, done after the project exists.

After you click Create project

  1. The dialog closes and the project is saved.
  2. You’re navigated to the new project’s detail page (#/projects/{id}).
  3. The very first thing you’ll usually do is link a repo — until you do, the page shows a “No linked repos” warning and milestones + most surfaces stay empty. Hit Link a repo… in that warning, or open Settings › Repos › Manage repos…. See Link boards & repos.

Editing later

Nothing here is permanent. From the detail page you can change the name and description (Edit details), the start/due dates (the Timeline tile’s pencil), the lead (the Lead tile), and the status (archive/restore via the Settings menu). All of these go through the same safe edit path that won’t overwrite someone else’s concurrent change.